GREAT EASTERN MALL & OFFICE TOWER

Energy Enhancement  – 88 units of AHUs Fan upgrade to EC Fan System

  • Replace the old Centrifugal to new EC fan system
  • New Standalone DDC Control system
  • Temperature Sensor to New Control system if necessary
  • NEW VAV Box c/w CO2 system for FA control
  • Reconfiguration of Existing BMS system for Start / Stop Operation